格式:pdf
大?。?span class="single-tag-height">407KB
頁數(shù):
The switches installed in converter station valve halls in Xiangjiaba-Shanghai ±800 kV UHVDC project are expensive and maintenance inconvenience.Two optimization schemes of the valve hall grounding switches for researches on the function and operation of the switchers are presented.The two schemes are both studied in detail,with one way of abolishing all grounding switches on transformer valve side,and another way of partly cancelling the switches.Detailed analysis is further carried out for the feasibility and the pros and cons of the two schemes.Based on the comparison of two schemes,the partial reduction of grounding switches is selected to get a simulation with an EMTDC model.Plus in order to verify the reliability of the simulating results,a field test is carried out in Fengxian converter station with the partly switches cancellation scheme.The test results proved that using only one switch can still release residual charge in the valve hall in a relatively short period.Optimized designs of the valve hall switches can save both space and costs of the project.
客廳開關(guān)布置圖知識來自于造價通云知平臺上百萬用戶的經(jīng)驗與心得交流。 注冊登錄 造價通即可以了解到相關(guān)客廳開關(guān)布置圖最新的精華知識、熱門知識、相關(guān)問答、行業(yè)資訊及精品資料下載。同時,造價通還為您提供材價查詢、測算、詢價、云造價等建設(shè)行業(yè)領(lǐng)域優(yōu)質(zhì)服務。手機版訪問:客廳開關(guān)布置圖