造價通
更新時間:2024.12.28
線盒布置圖(開關(guān))

格式:pdf

大?。?span class="single-tag-height">137KB

頁數(shù): 1頁

1 2 3 4 5 6 7 8 9 風(fēng)暖+排風(fēng) 10 11 12 13 14 排風(fēng)+燈 16 17 15

特高壓直流輸電工程閥廳接地開關(guān)布置優(yōu)化(英文)

格式:pdf

大?。?span class="single-tag-height">407KB

頁數(shù):

The switches installed in converter station valve halls in Xiangjiaba-Shanghai ±800 kV UHVDC project are expensive and maintenance inconvenience.Two optimization schemes of the valve hall grounding switches for researches on the function and operation of the switchers are presented.The two schemes are both studied in detail,with one way of abolishing all grounding switches on transformer valve side,and another way of partly cancelling the switches.Detailed analysis is further carried out for the feasibility and the pros and cons of the two schemes.Based on the comparison of two schemes,the partial reduction of grounding switches is selected to get a simulation with an EMTDC model.Plus in order to verify the reliability of the simulating results,a field test is carried out in Fengxian converter station with the partly switches cancellation scheme.The test results proved that using only one switch can still release residual charge in the valve hall in a relatively short period.Optimized designs of the valve hall switches can save both space and costs of the project.

熱門知識

室內(nèi)開關(guān)布置圖

精華知識

室內(nèi)開關(guān)布置圖

最新知識

室內(nèi)開關(guān)布置圖
點擊加載更多>>

相關(guān)問答

室內(nèi)開關(guān)布置圖
點擊加載更多>>
專題概述
室內(nèi)開關(guān)布置圖相關(guān)專題

分類檢索: